After the sanctions were imposed, the supply of equipment and components for existing gas turbine and gas piston installations stopped. Alternatives are needed to replace the outgoing ones and build new facilities. There is a need to search for new import-substituted reliable types of generation with a capacity of 2-5 MW. There is a need for mobile sources of electricity that can be replicated to other sites.
A multiple reduction in the time from the moment the CD is loaded into the system to the output of the finished product (several hours, instead of weeks and months), the high price of specialists in traditional industries where technologists, materials scientists, designers, service technicians, operators, testers, etc. are required - only one operator is required to maintain a 3D printer due to a very high degree of automation (moreover, one operator can service 30 or more 3D printers in one shift!). Full control of technical processes
For queries about BRICS Solutions Awards please reach out to Agency for Strategic Initiatives International Office Team: